Re-Roofing In Erith

Is your Erith roof past the point where repairs make sense?

Full roof replacements for Vickers-era houses, 1930s semis and riverside homes in Erith

Re-roofing in Erith is usually the end of a long story. A roof gets patched after one storm, then another, until the patches outnumber the original tiles. By then a new roof is usually the cheaper option over time. We're roofers from west Dartford who replace roofs across Erith, from the First World War houses on Northumberland Heath to 1930s homes on the ABC roads and newer properties near the riverside. A new roof here has to be built for the wind. That means a breathable membrane, new treated battens, tiles fixed to suit the exposure, and ridges and verges held by mechanical fixings rather than mortar alone. It starts with a free survey and a written quote.

Bungalows and chalet houses with tiled roofs along Luddesdon Road, Erith
Photo: Chris Whippet, Wikimedia Commons, CC BY-SA 2.0

Re-Roofing Quote In Erith

A roofer rings you back to arrange a visit.

The survey and quote are free. We only use your details to answer your enquiry - see the privacy policy.

Re-Roofing · Erith

What a new roof from us includes in Erith

A re-roof is a big outlay. These are the parts of the job we won't cut corners on.

01

Stripped to the rafters

Everything comes off: tiles, battens, old felt. It's the only way to see the state of the rafters, and on century-old Northumberland Heath roofs there's often a split or sagging timber that needs sorting before anything new goes on. We photograph every timber repair, so you can see what you paid for.

02

Breathable membrane

Old bitumen felt traps moisture in the loft, and condensation on the timbers is the result we see most. A modern breathable membrane lets water vapour out while keeping rain off, which matters in a house where loft insulation has been added over the years.

03

Fixings for the riverside

Every tile is fixed to the standard the roof's exposure demands. On windier Erith streets that means more clips and nails than a sheltered roof inland, plus dry-fixed ridges and verges that don't depend on mortar holding up. That detail matters most in the first big storm after the job.

04

Weight checked first

Swap a light covering for heavy concrete tiles and the rafters carry a lot more load. If a new covering adds 15% or more to the roof's weight, Building Regulations approval is needed. We work that out before you choose. It's a quick sum once the rafters are measured, and it can save an expensive surprise.

05

Insulation upgraded

A roof counts as a thermal element, so re-covering it is the time to bring the insulation up to current standards. We'll explain what that means for your house and price it in, so it isn't a surprise on the building control paperwork.

06

A written guarantee

A full replacement comes with our 10-year guarantee, set out on paper. Keep it with the house deeds, because buyers' solicitors tend to ask. You'll know what it covers and how to make a claim.

1,000+

Roofs repaired, renewed and rebuilt

10 yrs

Written guarantee on every re-roof

5★

The only rating anyone has left us

£0

For the survey and the written quote

Scaffold around a terraced house roof re-covered in new blue breathable membrane and battens, between neighbouring slate roofs
Photo: Richard Hoare, Wikimedia Commons, CC BY-SA 2.0
Erith

Re-roofing the different parts of Erith

Erith isn't one type of house, so it isn't one type of re-roof. On Northumberland Heath, the Vickers estate was built in sizes matched to each worker's grade, so a labourer's cottage and a manager's house on the same estate need very different amounts of material. Many of those roofs have been re-covered before, sometimes in a heavier tile than the original. We check the rafters, wall plates and party walls before suggesting anything.

Around the town centre, much of the housing dates from after the clearances of 1966 to 1980, and the roofs tend to be simpler shapes. In the Lesney Park Road, Erith Riverside, Brook Street and Oak Road conservation areas, the choice of covering carries more weight, and changing material may need a word with Bexley's planners first. Whatever the street, exposure decides the fixing specification. You never see that part of a re-roof, and here it matters most.

If your roof has life left in it, roof repairs in Erith may be all you need, and we'll tell you so after the survey.

"Several Erith roofs we've stripped turned out to carry two or three generations of patching, with newer tiles laid over the same tired battens."
Based on re-roofing jobs handled by Pro Roofers Dartford in Erith
What happens when

How we re-roof a house in Erith

  1. 1

    Survey and measure

    We measure every slope, check the loft, and look at chimneys, valleys and the neighbours' roofs where they meet yours. On a re-roof the survey sets the materials list, so we take our time over it. Expect us to be there for an hour or so on a typical semi.

  2. 2

    Choose the covering

    We'll go through the realistic options for your house, slate, clay or concrete tiles, and what each one weighs. If you're in a conservation area we'll flag it now, so the choice doesn't land you in trouble later. Samples are worth seeing in daylight, held up against your own roof line if possible.

  3. 3

    Building control and neighbours

    A full re-roof covers more than half the roof, so building control has to be involved. We'll explain which route applies. If you share a party wall, we'll go over how the Party Wall etc. Act 1996 might apply before the scaffold arrives.

  4. 4

    Scaffold and protection

    Scaffold goes up with edge protection and sheeting where needed. Before stripping starts we check the forecast, and we only open as much roof each day as can be made watertight by evening. On a terrace, we'll agree with the neighbours where the scaffold meets their side.

  5. 5

    Strip and repair timbers

    Old coverings come off and go straight into a skip. We inspect each rafter, replace or strengthen anything split or rotten, and correct any sagging before a single new batten goes on.

  6. 6

    Membrane, battens, tiles

    A breathable membrane goes down, then treated battens set to the gauge for your chosen tile. Tiles are laid and fixed to the exposure standard for that roof, with dry-fixed ridges and verges and new lead where it's needed.

  7. 7

    Final checks and paperwork

    We go over the finished roof, clear the gutters, strike the scaffold and hand you the photos and the building control completion paperwork. Then every last bit of waste leaves with us. The gutters get a final rinse so nothing from the job blocks a downpipe later.

10

Years' cover on a new roof

1,000+

Roofing jobs finished

Paperwork in your hand on the last day. Not posted out "in due course".

The guarantee

What the 10 year guarantee on a re-roof actually covers

Re-roof a house in Erith with us and you get 10 years of cover on the workmanship. It's a written document. It has your address on it, lists what was done, and is dated the day the roof is signed off. If water gets in because something was fitted wrong - a batten, a fixing, a lap, a flashing - a roofer comes back and puts it right. You don't pay for that.

Why are we happy to promise ten years? Because of how the roof goes on. Every tile or slate is mechanically fixed to BS 5534, the current British Standard. Ridges and hips are fixed too, not just sat in mortar. A breathable membrane goes down first. Where a roof meets a wall, a chimney or the house next door, it gets proper lead or a tested dry system. Shortcuts there are what make a guarantee expensive, so we don't take them.

Tiles, slates and membranes also carry the maker's own warranty. Those vary by product, and your paperwork tells you which ones apply. If a job is too unusual to guarantee in the normal way, you'll hear that at quote stage.

Which roof covering suits an Erith house?

Read the table below for the main coverings on offer. For Erith, wind resistance and weight are the two columns worth reading twice, especially if your house dates from the Vickers era.

Comparison point Concrete interlocking tileClay plain tileNatural slateFibre cement slate
Typical lifespan 50 years or more60 to 100 years80 to 100+ years, depending on sourceAround 30 years
Weight HeavyHeaviest, as each tile is double-lappedLightLightest of the four
Relative cost LowestMid to high, slow to layMid to high, Welsh slate dearestLow to mid
Look Chunky profile, common on postwar homesSmall, warm-coloured, traditional Kent lookThin, dark and neatUniform slate look, flatter colour
Planning and conservation Fine for most homes, can jar in a conservation areaOften expected on older Kent buildingsThe like-for-like choice for slate roofsMay be refused on listed or conservation roofs
Best for Budget re-roofs on postwar and newer housesPeriod homes and steeper pitchesVictorian terraces, slate-to-slate jobsLighter swap where rafters are marginal

What a new roof costs in Erith

Every re-roof is priced from a survey. These are the factors that move the number most in Erith. The quote shows each one as its own line.

House size and type

A terrace re-roof typically costs £8,000 to £14,500. Larger 1930s semis, like many on the ABC roads at Northumberland Heath, sit nearer £10,500 to £16,000. Detached houses start around £14,000 and can pass £24,000 when the roof shape is complicated.

Chosen material

Concrete tiles generally cost least, both to buy and to lay. Natural slate and handmade clay cost more, in materials and in labour. If you're in one of Erith's conservation areas, the cheapest option may not be the one the council will accept.

Timber condition

On older Erith houses, the century-old Vickers homes especially, nobody can promise the rafters are sound until the old covering is off. We price an allowance for common timber repairs and show you photos of anything that goes beyond it.

Chimneys and extras

Taking down a redundant chimney, rebuilding a stack, replacing fascias or adding rooflights all change the price. We list each one separately so you can decide what goes in now and what can wait. Some owners spread the extras over two years.

Read the full Dartford roofing cost guide

Re-Roofing in Erith: your questions

Do I need planning permission to re-roof in Erith?

Usually not, if the new roof looks much the same as the old one. Planning in Erith sits with the London Borough of Bexley. If your home is in a conservation area such as Lesney Park Road or Erith Riverside, or it's listed, check with Bexley before changing the material or colour, as some conservation areas in the borough have Article 4 directions that remove the usual freedoms. Building Regulations still apply: re-covering more than half a roof needs building control approval.

Will a heavier tile be a problem on my Northumberland Heath house?

It might. These houses were built during the First World War with rafters sized for the original covering. Moving to concrete tiles can add a lot of weight, and if it adds 15% or more, Building Regulations approval is needed and the timbers may need strengthening. We check the rafters and work out the load before recommending anything.

How long does a re-roof take in Erith?

A typical terrace or semi takes one to two weeks once the scaffold is up, depending on the weather and what we find under the old tiles. Wind is the main thing that slows us here, because laying membrane in strong gusts isn't safe. We'll give you a realistic timescale at quote stage. Expect noise on the stripping days and fairly little after that.

Can my neighbour and I re-roof at the same time?

Yes, and on a terrace or semi it often makes sense. Sharing scaffold can cut costs for both households, and the join along the party wall is done once, properly. Each of you gets your own quote and pays for your own half. If only one side is being done, we'll still make a neat, watertight junction with next door's roof.

What happens if it rains while my roof is open?

We plan around it. Each day we only strip as much as we can make watertight before we leave, and membrane goes on as soon as the timbers are clear. Tarpaulins stay on site for sudden showers. This stretch of the Thames estuary gets far less rain than most of the UK, so long wet spells are rarer than you'd think, but we don't take chances.

Off the ladder

Things to do in Erith

Where we work in Erith

Reviews

Reviews from Erith homeowners

Every review left for us so far has been five stars. We're adding them here as they come in.

Reviews only tell you so much anyway. When a roofer comes out to Erith, ask to see photos of a recent job on a house like yours. A good roofer will have plenty and won't mind you asking.

Talk to us about a new roof in Erith

We'll survey, measure and send a written quote that lists every part of the job. Take as long as you need to decide. The survey is free, and so is the advice.